Workplace EV Charging in Melbourne - A Planning Guide for Employers
16 November 2026 · 7 min read · By Jasper Lindsay, A-Grade Electrician & Founder
Chargers in the staff car park have moved from perk to planning item. How many bays, what the supply can actually give, who pays for the power - the three questions that size a workplace EV charging project, and why the December shutdown is the cheapest time to do the disruptive part.
Workplace charging requests used to arrive one at a time - a single early-adopter asking facilities whether they could run a lead out the window. Now they arrive as an agenda item: staff are buying EVs, fleet reviews keep landing on electric, and tenants ask about charging the way they once asked about bike storage. The good news is that a workplace charging project is a well-understood piece of electrical work. The expensive versions of it are almost always the unplanned ones - a charger bolted on wherever was easiest, then another, until the supply runs out and the real project starts from behind. Here's how we plan them properly.
The three questions that size the project
Every workplace charging quote we build starts with the same three questions. First: how many bays, now and in five years? The answer shapes the civil work - conduit and cable paths cost little to oversize while the trench is open or the ceiling is off, and a car park wired for four chargers but provisioned for twelve grows cheaply. Second: what can the supply actually give? Chargers are a large new load on a building that already has one, and the honest starting point is a look at the switchboard and the site's existing demand, not a brochure. Third: who pays for the power? Staff charging as a perk, fleet charging on the company's meter and tenant charging that gets billed back are three different setups, and the billing and access control that sorts them out is far easier to specify up front than to retrofit.
Load management is the budget's best friend
The line item that frightens building owners is the supply upgrade - and it's the one a well-designed system usually avoids. Dynamic load management watches what the building is drawing and gives the chargers what's left, so a bank of chargers absorbs into the existing supply instead of triggering an upgrade. On sites with rooftop or carpark solar it gets better: generation that would otherwise export for cents goes into vehicles instead, and our commercial solar team sizes arrays from the site's own interval data, so the charging load and the solar case get designed from the same numbers rather than guessed separately.
Speeds: what staff parking actually needs
There's a reflex to specify the fastest charger on the price list, and for most workplaces it's the wrong instinct. A 7kW charger adds 40-45km of range per hour - over a working day's dwell time, that's a full daily commute recovered several times over, which is why 7kW AC is the workhorse of staff parking. Three-phase 22kW units, which fully charge most EVs in three to four hours, earn their keep where vehicles turn over - fleet pool cars, visitor bays, vans that go back out after lunch. Mixing the two across a car park, with load management across the lot, nearly always beats a smaller number of fast units fighting over the same supply. The running-cost argument your staff are already making to themselves is in our petrol vs ev charging cost melbourne 2026 guide.
Why this lands on November's desk
The disruptive part of a workplace charging install - switchboard work, new distribution, cable runs through occupied areas - is exactly the category of work that belongs in the December-January closure, alongside everything else in our december shutdown electrical works melbourne guide. A project scoped in November gets its board work done while the site is empty and its chargers commissioned before everyone's back; the same project scoped in February gets negotiated around a trading building, weekend by weekend. If the question 'should we do chargers this year?' is live in your business, the window for the cheap answer is now.
Who we do this for
Workplace and fleet charging sits inside our commercial work: SWMS and inductions before anyone's on site, works staged around trading hours or shutdown windows, and a Certificate of Electrical Safety plus as-built documentation on handover. For apartment buildings the shape is different - shared supply, owners corporation decisions, user billing from day one - and that version has its own guide in apartment ev charging melbourne owners corporations. Either way the quote is fixed-price, staged, and built from a site walk-through rather than a floor plan.
- Count bays for five years ahead - conduit is cheap while the trench is open, chargers can come later
- Check the supply before the brochure: load management usually absorbs charging into the existing connection
- Decide who pays for the power up front - perk, fleet and tenant billing are three different builds
- 7kW covers staff parking's working-day dwell; keep 22kW three-phase for vehicles that turn over
- Scope in November, install in the December shutdown - the empty-building discount is real
Thinking about chargers for your site - two bays or twenty? Send the address and roughly what you have in mind through contact us and we'll walk the site, check the supply and come back with a staged fixed-price scope, typically within 2 business hours. Owners corporations and property managers welcome.
Workplace charging rewards the businesses that treat it as infrastructure rather than an accessory: planned once, provisioned for growth, billed sensibly and installed when the building is quiet. Our ev charging and commercial teams design it as one project - licensed A-Grade electricians, REC 37142, $20 million public liability, across metropolitan Melbourne.