Electrical Fit-Outs Delivered On Programme
Retail, hospitality and medical tenancies across Melbourne. We work to the builder's programme and the landlord's access rules, and hand over with the certification your occupancy depends on.
We deliver the full electrical scope on retail, hospitality and medical fit-outs across Melbourne - supply and distribution, lighting, emergency and exit systems, mechanical services connections, and the compliance certification that lets you open. Most tenancy fit-outs run two to six weeks on site depending on scope and landlord access. Every job is quoted fixed-price against drawings before we start.
What We Offer
Commercial Fit-Outs Features
Supply & Distribution
Main switchboard and distribution board works, sub-mains, three-phase supply, and metering coordination with the landlord and distributor.
Lighting & Controls
Feature, ambient and task lighting to the designer's spec, with dimming, zoning and occupancy control. Energy-efficient throughout.
Emergency & Exit
Emergency and exit lighting designed, installed and commissioned to AS 2293.1, with the six-monthly testing regime set up from handover.
Mechanical & Plant
Connections for HVAC, extraction, refrigeration and commercial kitchen plant, including isolators, interlocks and controls.
Compliance Certification
Certificate of Electrical Safety lodged with Energy Safe Victoria, plus as-built documentation and testing records for your handover pack.
Out-of-Hours Works
Night and weekend works in trading centres and occupied buildings, so live tenancies and neighbouring businesses keep operating.
Sectors
Fit-Outs We Specialise In
Three sectors we know properly. Each has its own compliance obligations and its own cost of downtime.
Hospitality
Commercial kitchen power and isolation, extraction and refrigeration connections, ambient and feature lighting, outdoor dining electrics, and signage circuits. Usually against a hard opening date.
Retail
Display and feature lighting, point-of-sale power, signage, security and data-room power. Shopping centre works delivered out of hours to centre access rules.
Medical & Dental
Clean, continuous supply for imaging, sterilisation and chair equipment, UPS and emergency systems, and body-protected area requirements under AS/NZS 3003 where treatment areas demand it.
Why Us
What Makes a Fit-Out Go Wrong
Almost always one of these four, and all four are avoidable if they're checked before anyone is on site.
Supply Discovered Late
Finding out at rough-in that the tenancy can't carry the kitchen or the plant. A distributor supply upgrade carries weeks of lead time - we check available capacity against the load schedule during the quote.
Landlord Access Rules
Centre and building managers restrict when work can happen, when noise is allowed and when the switchboard can be isolated. We build those constraints into the programme rather than discovering them.
Certification Gaps
Occupancy can stall on missing emergency lighting commissioning or an unlodged Certificate of Electrical Safety. The documentation is part of the job, not an afterthought.
Scope Drift
Variations that appear as invoices rather than conversations. Provisional sums are called out in our quotes and anything outside scope is priced and agreed before it's done.
Our Process
How It Works
Drawings & Scope
We review the architectural and services drawings, identify what the existing supply will and won't carry, and flag long-lead items early.
Fixed-Price Quote
A priced scope against the drawings, with provisional sums called out separately so there are no surprises mid-programme.
On-Site Delivery
Rough-in, fit-off and commissioning to the builder's programme, with SWMS lodged and our team inducted to site before we start.
Certification & Handover
Testing, Certificate of Electrical Safety, as-built drawings and O&M documentation, plus a walkthrough of the emergency lighting test regime.
FAQ
Frequently Asked Questions
How long does an electrical fit-out take?
Do you work to a builder's programme or direct for the tenant?
Can you work outside trading hours?
What happens if the existing supply isn't adequate?
What documentation do we get at handover?
Related Services
Explore More Services